You are here: Home » Resource » Case Studies » Cases » Irrigation Valve Boxes Construction Case

Cases

FCST’s Case section showcases our industry-specific successful projects. It highlights how FCST’s solutions solve real challenges, demonstrating our expertise and helping you trust our ability to meet your needs.

Irrigation Valve Boxes Construction Case

Views: 500     Author: Site Editor     Publish Time: 2025-08-21      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

- Country: Canada

- Industry: Water Treatment

- Time: July, 2022

- Product: 10″Irrigation Valve Boxes


Case Overview
The end client manages water supply treatment and maintenance for an 80 km² area, with pipe networks serving over 200 industrial enterprises and 500,000 residential users. The existing 6,000+ valve wells, constructed with traditional brick masonry, suffer from long-term infiltration of industrial wastewater and groundwater erosion, leading to issues such as well body cracking (15% annual damage rate), manhole cover subsidence (30% of cases), and valve corrosion/sticking (200+ monthly maintenance incidents). These problems cause frequent water leaks (average 10 tons/well/year), not only wasting water resources but also disrupting industrial production due to emergency repairs.


Solution

After analyzing the client’s pain points based on their requirements, we recommended the 10-inch Irrigation Valve Boxes solution in line with industry standards. Following technical exchanges, competitive product comparisons, and sample testing, the product was confirmed to meet specifications. A contract was signed to deploy the solution in key responsibility areas.


Customer Benefits

1.Rapid On-site Installation: On-site construction costs reduced by 70%.

2.Fast Delivery: Order fulfillment within 20 working days.

3.Low-carbon&Eco-friendly: Minimal construction waste (e.g., broken bricks, mortar) generated during installation.

4.Reduced Water Loss: Leak incidents dropped from 600 to 90 annually, saving 48,000 tons of water per year (equivalent to monthly water usage for 24,000 households). Based on industrial water pricing of $5/ton, annual water cost savings reach $240,000.


Related Products
Contact Us
Project Inquiry >
Customized technical support to meet different requests.
Contact Sales >
Contact our sales team for products and solutions inquiries.
Online Chat >
Chat with our live agent for general inquiries now.
Underground Cable Installation Solution Supplier Since 2003.
Leave a Message
Contact us
*

Products

Resource

Company

Contact Us

Tel: +86 21 3872 6791
Mob: +86 187 2062 4696
Email: sales@fcst.com
Add: Rm402 block A Watts gallop tower No.2816 YiXian Rd, BaoShan District, Shanghai 200441.

Stay In Touch

© 2003-2025 Fiber Cable Solution Technology Co.,Ltd. All Rights Reserved. SitemapPrivacy Policy