FCST’s Case section showcases our industry-specific successful projects. It highlights how FCST’s solutions solve real challenges, demonstrating our expertise and helping you trust our ability to meet your needs.

Residential Community Low-voltage Power Line Wiring Project

Views: 500     Author: Curry     Publish Time: 2025-12-24      Origin: https://www.microductcoupler.com/

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

- Country: Germany

- Industry: Power Industry

- Time: May, 2025

- Product: FPL1000 Cable Pulling Lubricant


Residential Community Low-voltage Power Line Wiring Project

Solution

Application: Manual application method

This method is used for pulling cables from low-voltage substations (10kV-1kV) to residential distribution cabinets (1kV-220V).  Previously, pulling a 20-meter cable required at least 15 workers, but with FPL1000 Cable Pulling Lubricant, only 12 workers are needed; and the time required is reduced from 50 minutes to 20 minutes


Related Products
Contact Us
Project Inquiry >
Customized technical support to meet different requests.
Contact Sales >
Contact our sales team for products and solutions inquiries.
Online Chat >
Chat with our live agent for general inquiries now.
Underground Cable Installation Solution Supplier Since 2003.
Leave a Message
Contact us
*

Products

Resource

Company

Contact Us

Tel: +86 21 3872 6791
Mob: +86 187 2062 4696
Email: sales@fcst.com
Add: Rm402 block A Watts gallop tower No.2816 YiXian Rd, BaoShan District, Shanghai 200441.

Stay In Touch

© 2003-2025 Fiber Cable Solution Technology Co.,Ltd. All Rights Reserved. SitemapPrivacy Policy